top of page

Test Mule Assembled

  • Apr 10
  • 1 min read

Pre-Testing Assembly of Test Mule in Progress


Pod taxi, Personal Rapid Transport, Ecological Autonomous Transportation System


New Delhi, Delhi (Sept 24, 2024)


First prototype of mule being assembled to integrate the electronics and allied subsystems before it is put on the test track for early testing and debugging. This mule is being built around the design and concept as per the patent granted for India earlier licensed to EcoAutoMo for building the various other sub-systems around it.


The plan is to run the mule on a limited track length of ~30m to test several features as an integrated unit in a controlled manner.


The next step would be to improve the design and build 3 additional mules as improvement iterations to be run on a longer track length to test the mule at higher speeds and also test its interactions and synchronicity with the other 3 mules.








 
 
 

Comments


Copyright © 2021
AutoBots | EcoAutoMo Pvt Ltd
Eco<Logical> Autonomous Mobility Reinvented

Thanks for subscribing!

  • Twitter
  • LinkedIn
bottom of page